Stair Pressurisation Network Modelling

Stair Pressurisation Network Modelling

A stair pressurisation system can pass a simple fan calculation and still fail on the day it is tested. That is because pressure in a stair depends on more than fan size. It also depends on leakage through doors and walls, the height of the building, the outdoor temperature and which doors are open. Network modelling lets us test all of this on a computer before the system is built. For high-rise towers in Dubai, Abu Dhabi and across the UAE, it is one of the clearest ways to show Civil Defence that stairs will stay smoke-free.

Why a Simple Fan Calculation Is Not Enough

A hand calculation usually treats the stair as one space at one pressure. In a real tower:
• pressure drops as air travels up or down the stair;
• top floors can be over-pressurised, so doors become too hard to open;
• lower floors can fall below the minimum pressure; and
• opening one door changes the pressure on every other floor.
A network model treats each floor as a node and each door gap, wall crack and shaft as a flow path. It then solves the whole building at once, in seconds, for as many scenarios as needed.

What a Good Network Model Looks At

1. Realistic leakage

Results depend heavily on how leaky the doors, walls and shafts are. Leakage should be based on the actual door types and construction, with sensitivity checks for poor workmanship.

2. Stack effect in tall buildings

Temperature differences between the stair, the building and outside create pressure differences that grow with height. In the UAE, hot outdoor air and air-conditioned interiors can reverse the usual pattern, so summer and winter both need checking.

3. Fan and injection points

A single fan at the roof often cannot hold even pressures over 40 floors. Multiple injection points spread the air along the stair and flatten the pressure profile.

4. Door-open scenarios

When the fire-floor door and the ground-floor exit door are open, pressure in the stair can collapse. The model shows whether the fan can respond and keep air flowing out through the open door.

5. Pressure relief and fan control

Barometric relief dampers or variable-speed fans stop pressures getting too high when doors close again. The model checks they work over the full range of scenarios.

Acceptance Criteria: Will the System Work?

The results should answer one simple question: will the stair stay free of smoke and can people still open the doors? This is checked using:
• Pressure Difference – high enough across closed doors to keep smoke out;
• Door-Opening Force – low enough for occupants to open stair doors; and
• Airflow – enough air leaving through open doors to push smoke back.

Use Network Modelling Early – Not Just to Pass Approval

Network modelling gives the most value while shaft sizes, fan locations and relief paths can still change. Testing early avoids costly fixes during commissioning, when it is often too late to add an injection point.

Use Network Modelling Early – Not Just to Pass Approval

This data helps engineers set tenability limits for evacuation routes and safe zones in buildings. It is particularly relevant for high-risk areas such as metro stations, tunnels, stadiums, and assembly buildings, where crowd exposure to toxic gases must be tightly controlled.

Frequently Asked Questions

  • 1. When is network modelling needed?
    Usually for high-rise buildings, stairs with several injection points, or where Civil Defence asks for proof that pressures stay within limits. Confirm this early in design.
  • 2.Is network modelling the same as CFD?
    No. A network model solves the whole building quickly but treats each space as one pressure. CFD shows local detail, such as airflow at a single door. They are often used together.
  • 3.What do you need to start?
    Architectural plans and sections, stair and lobby door schedules, ventilation drawings, fan data and the fire-mode cause-and-effect matrix.